Architecture · Industry
Aboabo–Orgafert Factory
Aboabo–Kumasi, Ghana
An unbuilt industrial park proposal in Kumasi connecting organic fertiliser production, resource recovery and site planning.
From organic waste to productive infrastructure.
- Project date
- May 2023
- Location
- Aboabo–Kumasi, Ghana
- Project context
- Master of Architecture, year one · May 2023
- My contribution
- Individual M.Arch project · Concept, site planning, architectural drawings and 3D representations
- Methods & tools
- Revit, Lumion, Adobe Photoshop
Turning waste into a productive resource
Aboabo–Orgafert is an organic fertiliser factory proposal for Aboabo in Kumasi. It connects the community's waste-management challenges with the need to support farmers and improve soil quality. Organic waste becomes the starting point for an industrial programme that combines production, storage, administration and supporting infrastructure.
Form shaped by the work inside
The initial studies begin with a simple box, then slope its roof and develop the enclosure around a portal-frame structure. Roof-mounted solar panels, glazed façades and shading elements are considered as parts of the industrial envelope.
The sketches also study the delivery entrance, an elevated pedestrian connection between administration and production, and sheltered terrace seating. Planting and pergolas help define the outdoor spaces around the working buildings.
Working with the river and its catchment
The proposal spans both sides of the Aboabo River and considers flooding at the scale of the surrounding community. Green infrastructure is proposed along the river, with the factory intended to support its maintenance. The wider plan also identifies space for recreation.
The detailed plans place the production unit, raw-material depot, weighbridges, storage and water-treatment facility alongside separate administration access, gardens and service routes. Biogas, power and areas for future expansion are identified within the site programme.
A plan organised by the production sequence
The factory layout follows the movement of material from a raw-material depot through separate municipal and industrial waste-sorting points, a sterilisation zone and the main production hall. Weighbridges, truck parking, storage and maintenance facilities support this sequence, while quality-control laboratories and supervision spaces sit alongside the production area.
The ground-floor, first-floor and roof drawings bring the production spaces, support rooms and circulation into one building study. These drawings are retained from the original project presentation.
A practical industrial envelope
Recycled steel portal frames, industrial roofing sheets and large windows form the proposed material and structural approach. The section studies roof lighting and ventilation, while the elevations show the different conditions around production, administration and the planted screens.
Solar power, biogas, water treatment and rainwater collection are proposed as parts of the wider resource strategy. They are design intentions within this academic proposal.
Moving through the proposed factory
The views move from the entrance and administration frontage through the service areas, production yard and pedestrian connections. Outdoor seating is followed by the factory interiors, showing the relationship between the structure, machinery and spaces for movement.
Project credits
Individual first-year Master of Architecture project by Michael Mawuena Baccah, May 2023. Concept, site planning, architectural design and 3D representations. Unbuilt academic proposal for organic fertiliser production.